
Dh2 Billion Metro Extension and Etihad Rail Link Set to Power Dubai's New Airport
Getting to Dubai’s massive new aviation hub will look completely different over the next decade as a full slate of rail networks takes shape around Dubai South.
The emirate is building out a multimodal transit Web to serve the Dh128 billion ($34.8 billion) expansion of Al Maktoum International Airport (DWC). The facility will eventually replace Dubai International (DXB) as Dubai’s main gateway, designed to handle an initial 150 million passengers annually before scaling up to 260 million passengers and 12 million tonnes of cargo. To move that sheer volume of people across the country, the Roads and Transport Authority (RTA), Dubai Airports, and Etihad Rail are tying the terminal directly into national high-speed rail and expanded city metro lines.
How the Transit Network Fits Together
The first major rail connection opens in 2031. Sheikh Hamdan bin Mohammed bin Rashid Al Maktoum, Crown Prince of Dubai, Deputy Prime Minister, Minister of Defence, and Chairman of the Executive Council of Dubai, approved a Dh2 billion extension of the Dubai Metro. This three-kilometre addition will construct two new stations, linking the existing Route 2020 directly to the airport’s West Terminal.
Following the initial metro link, the Dh34 billion Metro Gold Line is scheduled to open on September 9, 2032. Spanning 42 kilometres with 18 stations across 15 strategic areas, the Gold Line will serve major residential and business districts across Dubai, including Dubai South. It will offer interchange access with the existing Metro network as well as Etihad Rail at Meydan and Jumeirah Golf Estates. Dubai Airports CEO Paul Griffiths noted that while the Gold Line is not a dedicated airport express, its integration makes DWC easily accessible for daily airport staff and local commuters across the city.
For travelers moving between airports, plans call for an Airport Express link directly connecting Al Maktoum International with Dubai International Airport.
Regional and Commuter Access
Passengers traveling from Abu Dhabi and the Northern Emirates will have direct rail access to the terminal via the national network. A dedicated station for Etihad Rail will be built directly at the airport, giving high-speed trains a direct stop inside DWC. According to Dubai Airports CEO Paul Griffiths, bringing Etihad Rail into the new terminal creates a unified surface transit hub that bridges land and air travel across the entire country.
Local residents and airport employees commuting within Dubai will rely on the urban metro grid. The combination of the Route 2020 extension, the Gold Line, and existing lines connects residential communities straight to the expanded terminal’s 400 aircraft gates and five parallel runways, cutting down on long highway drives to Dubai South.


