
Skip the terminal queue: Al Maktoum Airport plans hotel and metro check-ins
Travelers across Dubai could soon swap traditional airport queues for a quick stop at their hotel lobby or local metro station. Under a newly approved City Terminal Project backed by the Dubai 10X Initiative, officials are mapping out a system that lets passengers clear formalities well before stepping foot near a plane.
Dubai Airports CEO Paul Griffiths outlined the vision in interviews this week, pointing to remote check-ins as a way to reshape how residents and visitors move through the city. While a strict rollout timeline isn’t locked in yet, the framework aims to give passengers total flexibility over their first point of contact, whether they step out of a taxi, hop off a train, or walk down from a hotel room. Traditional drive-and-park check-in will still be there for anyone who wants it, but the remote option envisions baggage drop-offs happening miles away from the tarmac.
Behind the scenes, the logistics are moving fast. The Roads and Transport Authority (RTA) has already invited consultants to design a proposed 55-kilometre Airport Express Line meant to link DXB and Al Maktoum International Airport (DWC).
Construction on the broader DWC expansion is deeply underway as a massive $35 billion development. Piling and groundworks are already advanced, with Dh13 billion in contracts currently under construction and another Dh55 billion slated to be awarded before the end of 2026. When fully scaled, the airport is designed to handle up to 260 million passengers annually across five runways.
Before the first commercial passengers walk through the doors, operators plan to run DWC for at least a full year without any travelers onboard. That dry run will stress-test baggage systems, check-in tech, and transit links using proven methods from DXB.



