
Al Quoz gets major sewerage and drainage upgrade
Dubai Municipality has successfully completed Phase 1 of the Al Quoz Creative Zone sewerage project, providing upgraded sewerage and stormwater infrastructure in one of Dubai’s busiest industrial and creative hubs. This milestone is significant for businesses and daily commuters in Al Quoz, as enhanced drainage and utility capacity minimize disruptions during heavy rainfall and support growth across hundreds of plots.
Dubai Municipality said Phase 1 of the Sewerage and Stormwater Network Development Project in Al Quoz Creative Zone was delivered at a cost of Dh250 million as part of a wider Dh500 million programme to upgrade wastewater and rainwater infrastructure in the district.
The Dubai Municipality stormwater and sewerage network is designed to serve Al Quoz Industrial Areas 1, 2, 3, and 4, along with the corridor between Sheikh Zayed Road and Al Khail Road. This upgraded system aims to improve sewerage and stormwater management in Al Quoz, minimizing disruptions during heavy rainfall and enhancing service reliability for businesses throughout the area.
In Al Quoz, where warehouses, logistics yards, workshops, and creative spaces coexist, the upgraded drainage system enhances business continuity and public health. Improved stormwater management reduces surface water pooling, preventing delivery delays, protecting stock in ground-floor units, and ensuring easy access for staff and customers throughout this extensive industrial area.
A typical impact is evident during heavy rain: enhanced drainage capacity keeps internal roads and entry points to industrial plots accessible, minimizing downtime for loading bays and last-mile movements between Sheikh Zayed Road and Al Khail Road. For tenants and landlords, more reliable utilities facilitate smoother planning of expansions without service interruptions.
Al Quoz Creative Zone sewerage project:
| Item | Confirmed detail |
|---|---|
| Phase 1 cost | AED250 million |
| Total project investment | AED500 million |
| Coverage area | 1,600 hectares |
| Plots covered | More than 1,507 plots |
| Areas served | Al Quoz Industrial Areas 1–4 and the corridor between Sheikh Zayed Road and Al Khail Road |
| Phase 1 completion | April 2026 |
- Project: Sewerage and Stormwater Network Development Project in Al Quoz Creative Zone
- Delivered by: Dubai Municipality
- Goal: An integrated, adaptable and sustainable sewerage and stormwater system
- Service footprint: Al Quoz Industrial 1–4 plus the Sheikh Zayed Road–Al Khail Road corridor, covering 1,600 hectares and 1,507+ plots
The Al Quoz sewerage and stormwater upgrade is positioned as infrastructure support for the Al Quoz Creative Zone’s integrated urban model, aligning utilities with the district’s industrial-and-creative mix.



